The second phase of the Staryi Sambir-1 WF was completed

07.10.2016

The second phase of the Staryi Sambir-1 wind farm was completed in Western Ukraine. Vestas turbines were installed. Technologically, these are the most advanced turbines with a service life of 20 years.

ТОВ НОРДІК-БУД

© 2019-2025 Nordik-Bud LLC
All right reserved.

79005, Ukraine, Lviv
Shota Rustaveli, 7
phone.: (032) 229 53 05,
fax: (032) 229 53 05
E-mail: info@nordikbud.com.ua

Developed in ABK-Technologies